zurgina
  • How it works
  • Passport
  • For furniture makers
  • Resources
Join the beta
zurgina

Zurgina (zur·gi·na) is Basque for “the woodworker”. A build log and a passport for pieces made to order.

© 2026 Zurgina

Product

  • How it works
  • Build log
  • Passport
  • Sample passport
  • Roadmap
  • Changelog

For makers

  • Furniture makers
  • Join the beta
  • FAQ

Resources

  • Guides
  • Pricing calculator
  • Care card maker
  • Certificate template

Company

  • About
  • Data and privacy
  • Privacy policy
  • Terms
  • Cookies
  1. Home
  2. Guides
  3. How to keep clients updated during a custom furniture build

Running commissions

How to keep clients updated during a custom furniture build

Updated 30 October 2026 · 6 min read

Short answer

Plan five to seven updates for a twelve-week build, tied to stages the client can see: timber selection, joinery, dry fit, glue-up, first coat of finish and the finished piece. Send each one in the same channel, with a photo and two or three sentences. Share delays early with the reason and a new date.

This guide is for makers who build to order and want clients to feel involved without the updates eating into bench time. It suits studios of one to three people working on builds of a few weeks to a few months.

We cover why progress updates matter, a milestone plan for a twelve-week build, what to photograph at each stage, how to share bad news and how to keep the whole thing to a couple of minutes per update.

You know your process. The aim here is to make it visible to someone who has paid a deposit and is waiting.

Key takeaways

  • In five experiments, Buell and Norton (2011) found that people valued an online service more when they could see the work being done, even when that meant waiting longer.
  • Porsche's Track Your Dream service shows buyers production milestones and, at selected plants, photos of their own car on the line.
  • Five to seven updates are enough for a twelve-week build if each one is tied to a stage the client can recognise.
  • Timber selection, joinery, dry fit, glue-up, first coat of finish and the finished piece are the stages clients understand best.
  • When something slips, send the delay, the reason and the new date in one message, before the client asks.
  • Keep every update in one channel and never photograph a client's home without their consent.

Why updates matter

A client who commissions furniture pays a deposit, then waits weeks or months. Nothing they can see changes. Updates fill that gap.

There is research behind the instinct. Ryan Buell and Michael Norton studied what they called the "labor illusion". In five experiments set in online travel search and online dating, people rated a service more highly when the site showed the work it was doing. Some even preferred a longer wait with visible effort to an instant result. Their study looked at websites, so applying it to a workshop is our inference. Still, the idea carries over: people value work they can see.

Porsche applies the same idea to cars. Its Track Your Dream service, part of the My Porsche app, shows order status, production milestones with forecast dates and delivery progress. For selected plants, such as Zuffenhausen and Leipzig, buyers can see photos of their own car on the assembly line. A furniture maker has an advantage here: every stage of the build happens in one room, in front of one person with a phone.

Updates also help you. They create a dated record of what was agreed and when. They make staged payments easier, because the client has seen the stage that triggers the next one. See deposits and payment schedules.

A milestone plan for a twelve-week build

Most of a build is quiet from the client's side. Plan updates around stages where something visible changes.

Week Update What the client learns
1 Timber selected The actual boards their piece will come from
3 Parts milled, joinery under way Work has started on their order
5 Dry fit The piece standing for the first time
7 Glue-up The structure is now fixed
9 First coat of finish The colour and grain they will live with
11 Finished piece What will arrive, ahead of delivery
12 Delivery and care How to look after it

That is seven touch points. For a shorter build, merge joinery into dry fit and drop to five. If the agreement includes a client decision, such as approving a finish sample, add it as its own update.

Tell the client the plan at the start: "You will hear from me about every two weeks, with photos at each main stage." This sets expectations and cuts down on "any news?" messages.

A shot list for each stage

One or two good photos beat ten average ones. Use daylight or a consistent workshop light, and clear the bench behind the subject.

Timber selection. Photograph the boards laid out, with your batch or lot marks visible. If you can, show the grain on the face that will be the top or the doors. Clients like knowing which board becomes which part.

Joinery. One close-up of a typical joint: a set of tenons, a dovetailed drawer side. Clients do not need to understand the joint. They see care.

Dry fit. The whole piece assembled without glue, shot from the angle the client will see most often. This is the update that usually gets a reply.

Glue-up. The piece in clamps. It shows the structure becoming permanent.

First coat of finish. A close-up of the grain as the finish brings out the colour. Mention that colour may deepen over time, if it will with that timber and finish.

Finished piece. Two or three shots: full piece, a detail and one that gives scale. Natural light if possible.

How to share bad news

Delays happen: a supplier ships late, a board splits, you are ill. The longer you wait to say so, the harder the message gets.

A good delay message has three parts:

  1. The delay. "The table will be ready two weeks later than planned."
  2. The reason, in one sentence. "The top boards I selected moved more than I would accept after resawing, so I have replaced them."
  3. The new date. "I now expect to deliver in the week of 14 December."

Add a photo if it helps, such as the rejected board. Do not over-apologise or explain at length. If the delay affects a payment stage, say how. If you are unsure of the new date, give the latest realistic one rather than the hopeful one.

Keep each update under a couple of minutes

Updates only work if you keep sending them. Make each one quick:

  • Take the photo while the work is in front of you, not later.
  • Write two or three sentences: what happened, what comes next and when.
  • Use the same shape every time so you do not have to think about it.

A typical update reads: "Dry fit today. Everything closed up well, and the proportions look right in the room light. Glue-up next week, then finishing."

If an update takes longer than a couple of minutes, you are writing a report. Save the detail for the agreement and the final handover.

Choose one channel

Updates scattered across text messages, email and social media direct messages are hard for both of you to find later. Pick one channel at the start and stick to it. Email works. So does a single shared album or a private page per commission. Shared build-log tools exist for this, but the principle matters more than the tool: one place, in date order, that you and the client can both scroll back through.

Keep decisions in the same place. If the client approves a finish sample, the approval sits next to the photo of it.

Privacy

The finished piece often lives in the client's home. Photographing it there, or showing the room during fitting, needs their clear permission. Ask before you take the photo, and ask again before you use it anywhere public.

In updates, avoid showing anything that identifies the client: their name on a cut list, their address on a delivery label, family photos on the wall during installation. If you share build photos publicly, describe the piece and the timber, not the person who ordered it.

Close with a record

The last update is the one clients keep. Include the finished photos, the timber and its source, the finish used and how to care for it. A care card and a certificate of authenticity can sit alongside it. For oiled tops, point the client to caring for an oiled wood table.

Sources

  • The Labor Illusion: How Operational Transparency Increases Perceived Value, Management Science 57(9), 2011: five experiments showing visible effort raised perceived value of online services
  • Track Your Dream: follow your Porsche car's build, Porsche (2026): milestones, forecast dates and photos of the customer's car on the line at selected plants
  • Porsche Track Your Dream, Porsche Newsroom (2020): launch of the service for US customers in 2020

Questions this guide gets asked

What if a client asks for updates more often than I planned?+

Tell them your rhythm at the start, so they know when the next update is due. If they still ask, a quick photo of the bench is usually enough. Frequent requests are often a sign the client is anxious about the money or the date, so address that directly.

Should I send video?+

Short clips work well for things a photo cannot show, such as a drawer sliding or a door closing. Keep them under a minute and avoid narration you would need to redo. Photos are enough for most stages.

Can I post the client's piece on social media during the build?+

Ask first, and agree what you will show. Some clients are happy to be tagged, others want the piece kept private until it is delivered. Leave out names and anything that shows where they live.

What if the client does not respond to updates?+

That is common and usually fine. Updates are a record as well as a message. Only ask for a reply when you need a decision, and make that request stand out.

Should I show mistakes?+

Show problems that affect the client, such as a board you rejected or a delay. You do not need to share every recut. Clients tend to trust a maker more when they see judgement being applied.

What should the final update include?+

Photos of the finished piece in good light, the delivery arrangements and care instructions. Many makers add a short note on the timber and finish so the client has a record of what they own.

On this page

  • Key takeaways
  • Why updates matter
  • A milestone plan for a twelve-week build
  • A shot list for each stage
  • How to share bad news
  • Keep each update under a couple of minutes
  • Choose one channel
  • Privacy
  • Close with a record

Free tools

  • Pricing calculator
  • Care card maker
  • Certificate template

Where this fits

Running commissionsHow to commission custom furniture: process, timing and questionsWhat happens when you commission a piece from a furniture maker: brief, drawings, quote, deposit, build and delivery, typical lead times and what to ask.Read morePricing & depositsHow much deposit for custom furniture, and how to set a payment scheduleWhat a deposit on custom furniture is for, the ranges makers report, staged payment schedules, refund questions under consumer law and what to put in writing.Read moreCare & maintenanceHow to care for an oiled wood table, and how often to re-oil itDaily care, re-oiling intervals and fixes for white rings on oiled, hardwax oil, soaped and lacquered wood tables, with makers' and manufacturers' guidance.Read more

Beta

Join the beta

We are opening the beta to small groups of furniture makers first, so each studio gets a proper start. Free while it lasts.